Juniper-systems Allegro MX User Guide Manual de usuario Pagina 7

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 96
  • Tabla de contenidos
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 6
Getting Started
Install the Battery Pack
When you receive the Field PC, you must install and charge
the NiMH baery pack before using. To do this, complete the
following steps:
1. Push up on the sliding latches on the sides of the Field PC
to open the baery compartment door.
2. Place the NiMH baery pack in the le side of the baery
compartment, push down, and slide it all the way to the
right. There is a small arrow on the boom right corner of
the baery pack, make sure the arrow is pointing to the
right when it is placed in the Field PC.
Ch 1  Getting Started 7
Vista de pagina 6
1 2 3 4 5 6 7 8 9 10 11 12 ... 95 96

Comentarios a estos manuales

Sin comentarios